Case Study: Closed Loop Sampling System Upgrade at a Sinopec Refinery

Padrão editorial: Este artigo foi revisado pela equipe de engenharia da Wanan Technology, com mais de 20 anos de experiência na fabricação de equipamentos petroquímicos. O conteúdo faz referência às normas API, ISO, ASME e ATEX. Sobre nossa equipe.

Project Overview

As one of the largest integrated energy and chemical companies in the world, Sinopec operates dozens of refineries and petrochemical complexes across China. At a major refinery in eastern China, the facility management identified a systematic gap in their process sampling infrastructure: multiple distillation units and intermediate tank farms were still relying on traditional open-loop (grab) sampling methods that posed significant safety, environmental, and data-quality risks.

Wanan Technology was contracted to design, manufacture, and supply a comprehensive sistema de amostragem em circuito fechado package covering 18 sampling points across three process units — crude distillation, catalytic cracking, and product finishing. The project scope included engineering design, material selection, fabrication, factory acceptance testing (FAT), and on-site commissioning support.

The Challenge: Aging Sampling Infrastructure

The refinery’s existing sampling setup consisted of simple needle valves and open bottles — a method that had been in use since the facility’s original construction. Over years of operation and multiple HSE audits, several critical issues had been documented:

  • Operator Exposure: Sampling personnel were routinely exposed to benzene-containing streams, hydrogen sulfide (H2S), and volatile hydrocarbon vapors. Despite PPE requirements, the risk of acute exposure during high-pressure sampling events remained a persistent concern for the HSE department.
  • Fugitive VOC Emissions: Each open-loop sampling event released an estimated 0.5 to 2 liters of hydrocarbon vapor into the atmosphere. With hundreds of sampling operations per week across the refinery, the cumulative emissions were flagged in the facility’s environmental compliance audit as a priority remediation item.
  • Sample Inaccuracy: Lab personnel reported inconsistent Reid Vapor Pressure (RVP) results and variable distillation endpoints on identical feedstock samples. Root cause analysis traced the discrepancy to light-end losses during open-air sample transfer — particularly problematic for naphtha and gasoline blend stock analysis.
  • Regulatory Pressure: China’s evolving GB 31570-2015 standard for petroleum refining pollutant emission limits, combined with Sinopec’s internal corporate HSE upgrade program, created a firm deadline for sampling system modernization.

Solution Design & Engineering

Wanan’s engineering team conducted a site survey to map all 18 sampling points, documenting process conditions for each location:

Process UnitSampling PointsTypical FluidPressure RangeTemperature Range
Crude Distillation7 pointsCrude feed, naphtha, kerosene, diesel, atmospheric residue0.5 – 3.5 MPa40 – 350 C
Catalytic Cracking6 pointsLCO, gasoline, LPG, rich amine, sour water0.8 – 4.0 MPa40 – 200 C
Product Finishing5 pointsFinished gasoline, diesel, jet fuel, reformate0.3 – 2.0 MPa30 – 80 C

Based on this survey, three sampling panel configurations were designed:

1. Constant-Pressure Piston Cylinder Panels (8 points)

For volatile streams (naphtha, LPG, gasoline, reformate), constant-pressure sampling cylinders with spring-loaded pistons were specified. These maintain the sample at process pressure throughout extraction and transport, preventing light-end flash vaporization that would corrupt RVP and distillation analysis. The panels were equipped with dual-valve isolation, pressure gauges, and integrated purge loops.

2. Standard Cylinder Sampling Panels (7 points)

For stable liquid streams (diesel, kerosene, atmospheric residue, LCO), standard 316L stainless steel sampling cylinders with needle valves were selected. These panels included a process isolation valve, purge/vent valve, and cylinder connection with quick-connect fittings for efficient operator workflow.

3. Heated Sampling Panel (3 points)

For high-viscosity streams (atmospheric residue at 350 C), steam-traced heated panels with oversized bore tubing (3/8 inch minimum) were engineered to maintain fluidity during the sampling cycle. The panel design included a cooling section to bring the sample to a manageable temperature before entering the cylinder.

Equipment Supplied

ItemSpecificationQuantityCertificação
Constant-pressure sampling panels316L SS, rated 6.4 MPa, with piston cylinder (500 mL)8 setsASME U-Stamp, GB/T 150
Standard sampling panels316L SS, rated 4.0 MPa, with cylinder (1 L)7 setsASME U-Stamp, GB/T 150
Heated sampling panels316L SS, steam-traced, rated 4.0 MPa, with cylinder (1 L)3 setsASME U-Stamp, GB/T 150
Spare sampling cylinders316L SS, 500 mL & 1 L, with double-end valves40 setsEN 10204 3.1, GB 5099
Spare seal kits & gasketsPTFE/Graphite, full set for 2-year operation1 lotFactory tested

Implementation & Commissioning

The project was executed over a 14-week timeline:

  1. Weeks 1-3: Detailed engineering, P&ID review, and material take-off. Wanan engineers worked with the refinery’s process engineering department to confirm all tie-in points, isolation valve locations, and sample routing paths.
  2. Weeks 4-10: Manufacturing and fabrication at Wanan’s ASME U-stamp certified facility in Honghu, Hubei. All pressure-bearing components were hydrostatically tested at 1.5x design pressure. Material traceability per EN 10204 3.1 was maintained throughout.
  3. Weeks 8-9: Factory Acceptance Testing (FAT) conducted at Wanan’s facility with Sinopec inspection engineers present. Testing included pressure hold tests, valve functional tests, cylinder leak tests (helium sniffer at 1×10-6 std cc/sec sensitivity), and dimensional verification.
  4. Weeks 11-13: Shipment, site installation, and mechanical completion. Wanan field service engineers supervised the installation of all 18 sampling panels, including process tie-ins, tubing runs, and structural supports.
  5. Week 14: Commissioning and operator training. Each sampling point was functionally tested with actual process fluid. Operators received hands-on training on purge procedures, cylinder handling, and maintenance protocols. A detailed operation & maintenance manual (in Chinese and English) was delivered.

Results & Outcomes

Post-installation performance was monitored over a 6-month period, with the following documented outcomes:

MetricBefore UpgradeAfter UpgradeImprovement
Operator exposure incidents (per quarter)3-5 minor exposure events0 reported incidents100% elimination
Fugitive VOC emissions from sampling~150-200 L/week total vapor releaseNear-zero (measured below detection limit)>99% reduction
RVP analysis repeatability+/- 0.8 kPa variation+/- 0.15 kPa variation5x improvement
Lab sample rejection rate~12% (contamination/flash)<2% (procedural only)85% reduction
Time per sampling operation10-15 min (open method)4-7 min (closed loop)~50% faster

Beyond the quantifiable metrics, the refinery’s HSE department reported that the closed loop sampling upgrade was cited positively in their subsequent corporate safety audit. The environmental compliance team confirmed that sampling-related fugitive emissions were effectively eliminated from the facility’s emissions inventory report.

Key Takeaways for Refinery Operators

This project illustrates several principles that apply broadly to sampling system upgrades at any refinery or petrochemical facility:

  • One size does not fit all. A single sampling panel design cannot serve all process conditions. Volatile streams require constant-pressure piston cylinders; viscous streams need heated panels; stable liquids can use standard configurations. Proper engineering per point is essential.
  • Material traceability matters. For refinery applications, 316L stainless steel with full EN 10204 3.1 certification is the minimum standard. Sour service (H2S-containing) requires NACE MR0175/ISO 15156 compliance. Skipping material documentation to save cost is a false economy.
  • Operator training is non-negotiable. Even the best-designed closed loop system will underperform if operators fall back on old habits. Structured hands-on training during commissioning, supplemented by clear visual procedures at each sampling point, ensures sustained proper use.
  • Spare parts planning prevents downtime. Seals, gaskets, and spare cylinders should be ordered with the initial equipment. A 2-year spare parts inventory was included in this project and proved essential when one cylinder needed re-testing after a sour service exposure event.

For facilities planning similar upgrades, Wanan Technology offers site survey, engineering design, and custom manufacturing of closed loop sampling systems compliant with ASME, GB, ATEX, and PED standards. Our experience spans 40+ countries and includes work for Sinopec, PetroChina, ExxonMobil, Lukoil, and BASF facilities.

Perguntas frequentes

How long does a typical closed loop sampling system upgrade take for a refinery?

For a mid-sized refinery (20-30 sampling points), the typical project timeline is 12-16 weeks from engineering kick-off to final commissioning. This includes 2-3 weeks of detailed engineering, 6-8 weeks of manufacturing, 1-2 weeks for FAT, and 2-3 weeks for site installation and commissioning. Larger facilities or those requiring heated panels for viscous service may require additional time.

Can existing sampling points be retrofitted with closed loop panels?

Yes, the vast majority of closed loop sampling upgrades are retrofits. Wanan engineers assess each existing sampling point for process connection compatibility (flange size, thread standard), structural support availability, and access clearance. Most retrofits use the existing process nozzle with a new panel-mounted assembly, minimizing hot work and process downtime.

What certifications are required for sampling systems in Chinese refineries?

For domestic refineries, the primary standards are GB/T 150 (pressure vessels), GB 5099 (seamless steel gas cylinders), and where applicable, SEPA-approved emission controls. Wanan’s sampling panels and cylinders carry ASME U-Stamp certification (internationally recognized) plus domestic GB compliance documentation. For export-oriented facilities or those with international auditing, ATEX and PED certifications may also be specified.

How are sour service (H2S) sampling points handled differently?

Sour service sampling requires NACE MR0175/ISO 15156 compliant materials throughout the wetted path. Wanan specifies hardened 316L or duplex stainless steel for valve internals, specialized sour-service seals (PTFE with acid-resistant fillers), and cylinder internal passivation. Cylinders in sour service require more frequent inspection — typically annual instead of the standard 5-year hydrostatic re-test interval.

What is the ROI timeline for a closed loop sampling upgrade?

Most refinery sampling upgrades achieve positive ROI within 12-24 months through a combination of: eliminated exposure incident costs (medical leave, insurance), reduced lab re-sample labor, avoided environmental compliance penalties, and improved product quality (fewer off-spec batches due to accurate sampling). The largest single financial impact is typically the prevention of one off-spec cargo — a single bad RVP result on a gasoline shipment can cost more than the entire sampling system investment.


Planning a sampling system upgrade? Wanan Technology’s engineering team can help you assess your facility’s needs, design custom solutions, and deliver ASME-certified equipment with full documentation. We have supplied systems to refineries and chemical plants across 40+ countries.

Request a Consultation   Download Product Catalog

Artigos técnicos sobre amostragem petroquímica e segurança de tanques

A biblioteca técnica da Wanan Technology abrange guias de engenharia, critérios de seleção e normas de conformidade para sistemas de amostragem petroquímica, supressores de chamas e válvulas de segurança para tanques. Cada artigo é redigido por nossos engenheiros especializados em vasos de pressão e especialistas certificados pela API, com base em mais de 15 anos de experiência em fabricação e instalações em campo em mais de 30 países. Se você precisa dimensionar uma válvula de alívio de pressão e vácuo de acordo com a norma API 2000, selecionar um supressor de chamas certificado pela ISO 16852 ou especificar um sistema de amostragem de circuito fechado para serviço com gás ácido, esses guias oferecem o aprofundamento técnico de que você precisa.

Guias técnicos em destaque

O que é um sistema de amostragem em circuito fechado? Guia completo

Visão geral abrangente dos princípios, componentes e aplicações da amostragem em circuito fechado. Aborda a extração de amostras com emissão zero, o projeto de purga e retorno e a comparação com métodos em circuito aberto. Leitura essencial para engenheiros de processo responsáveis pela especificação de sistemas de amostragem para refinarias e plantas petroquímicas.

O Guia Completo para a Seleção de Supressores de Chamas

Metodologia passo a passo para a seleção de supressores de chamas para deflagração e detonação. Abrange a classificação da norma ISO 16852, aplicações no final da linha versus aplicações em linha, faixas de temperatura e seleção de materiais para serviços em ambientes corrosivos. Inclui exemplos práticos para tubos de ventilação de tanques de armazenamento e sistemas de recuperação de vapores.

Supressor de chamas x PVRV: qual deles você precisa?

Comparação direta entre supressores de chamas e válvulas de alívio de pressão e vácuo — dois dispositivos essenciais para a segurança de tanques, com funções distintas. Explica quando cada um deles é necessário, como funcionam em conjunto e quais são os erros comuns de configuração que comprometem a segurança dos tanques de armazenamento.

Como funciona um PVRV? Guia técnico completo

Análise aprofundada da mecânica das válvulas de respiro de pressão e vácuo. Aborda os projetos acionados por mola versus os acionados por peso, o cálculo da pressão de ajuste, a estanqueidade da sede e os requisitos de ventilação da norma API 2000. Inclui dicas de manutenção e modos comuns de falha.

Guia de dimensionamento de ventilação de tanques API 2000 com exemplos práticos

Guia prático para o dimensionamento de saídas de ventilação de tanques de armazenamento atmosféricos de acordo com a Norma API 2000. Aborda a entrada de gás decorrente da retirada de líquido e da contração térmica, a saída de gás decorrente do enchimento com líquido e da expansão térmica, bem como a ventilação em caso de incêndio. Inclui cálculos passo a passo para um tanque de 10.000 barris.

Explicação da Norma ISO 16852 sobre Supressores de Chamas

Explicação em linguagem simples sobre a norma internacional de desempenho dos supressores de chamas. Aborda os testes de deflagração versus detonação, as classes de temperatura de operação e como interpretar a etiqueta de certificação de um supressor de chamas. Essencial para engenheiros de conformidade e equipes de compras.

Requisitos da ATEX para supressores de chamas | Guia de conformidade com a UE

Guia completo sobre a conformidade com a Diretiva ATEX 2014/34/UE para supressores de chamas e equipamentos de amostragem. Aborda grupos de equipamentos, categorias, zonas e requisitos de marcação CE. Inclui uma lista de verificação de conformidade para importação para a União Europeia.

Guia de projeto de sistemas de amostragem para analisadores de processo

Guia de engenharia para o projeto de sistemas de amostragem que fornecem amostras representativas aos analisadores de processo. Aborda a localização dos pontos de amostragem, o dimensionamento das linhas de transporte, o cálculo do tempo de atraso e o projeto de circuitos rápidos. Destinado a engenheiros de instrumentação e especialistas em analisadores.

Guia de instalação do amostrador de circuito fechado

Procedimentos de instalação comprovados na prática para sistemas de amostragem em circuito fechado. Abrange conexões de processo, traçado da linha de purga, instalação do cilindro de amostragem e verificações de comissionamento. Inclui um guia de solução de problemas para dificuldades comuns relacionadas à amostragem.

Dimensionamento de válvulas de alívio de emergência: guia passo a passo (API 2000)

Metodologia detalhada para o dimensionamento de válvulas de alívio de pressão de emergência em tanques de armazenamento. Abrange o dimensionamento para casos de incêndio, condições anormais de processo e a escolha entre válvulas pilotadas e válvulas acionadas por mola. Inclui exemplos práticos para a ventilação de emergência de um tanque de petróleo bruto com capacidade de 50.000 barris.

Tópicos abordados

  • Sistemas de amostragem — Amostragem em circuito fechado, cilindros de amostragem, conexões de amostragem, integração com analisadores de processo
  • Supressores de chamas — Supressores de deflagração e detonação, ISO 16852, em conformidade com a ATEX, configurações de fim de linha e em linha
  • Válvulas de alívio de pressão e vácuo — Dimensionamento de PVRVs de acordo com a norma API 2000, com mola versus com contrapeso, manutenção da válvula de respiro
  • Válvulas de alívio de emergência — Ventilação em caso de incêndio, válvulas acionadas por piloto, dimensionamento da ventilação de emergência
  • Normas e conformidade — API 2000, ISO 16852, ATEX 2014/34/UE, ASME U-stamp, OSHA, EPA
  • Seleção de materiais — Aço inoxidável 316L, Hastelloy C276, aço inoxidável duplex, aço carbono para serviços com H₂S e ambientes corrosivos

Por que ler nossos artigos técnicos?

Todos os artigos da nossa biblioteca técnica são redigidos por engenheiros da Wanan Technology com experiência prática em fabricação e em campo. Não reutilizamos conteúdo genérico — cada guia é baseado em projetos reais de clientes, cálculos de dimensionamento concretos e lições aprendidas com instalações nas unidades da Sinopec, ExxonMobil, BASF e Lukoil. Nosso objetivo é ajudá-lo a tomar decisões informadas sobre especificações, seja você um engenheiro de processos, especialista em compras ou responsável pela conformidade.

Precisa de ajuda para escolher o equipamento certo para a sua aplicação? Entre em contato com nossa equipe de engenharia para receber recomendações personalizadas.

W

Equipe de Engenharia da Wanan

Departamento de Engenharia Técnica · Mais de 20 anos de experiência

Fabricante certificado pela ASME com o selo “U-Stamp”

A equipe de engenharia da Wanan Technology conta com mais de duas décadas de experiência no projeto e na fabricação de sistemas de amostragem petroquímica, equipamentos de segurança para tanques de armazenamento e dispositivos de alívio de pressão. Nossos engenheiros possuem certificações ASME, API e ISO e já forneceram equipamentos para refinarias, fábricas de produtos químicos e terminais de armazenamento em mais de 40 países, incluindo projetos para a Sinopec, PetroChina, ExxonMobil, Lukoil e BASF.

Certificações:Selo U da ASMEISO 9001ATEXEACAPI 2000PED 2014/68/UE